← Back to Operators

Operator: A8N90

Activity summary across Alberta public well records.

Total Wells
506
Flowing (FLOW)
14
3%
Pumping (PUMP)
228
45%
Suspended (SUSP)
257
51%
Abandoned (ABD)
0
<1%
Unknown Status
0
<1%

Status Breakdown

Flowing14 (3%)
Pumping228 (45%)
Suspended257 (51%)
Abandoned0 (<1%)
Unknown0 (<1%)

Track this operator

Get notified when new monitoring and operator activity features become available.

Recent Wells

Well IdentifierWell NameLicence StatusWell StatusTotal DepthFinish Date
00/01-25-061-16W4/4RBY HZ EDWAND 1-25-61-16AmendedPUMP2441.0 m
02/08-25-061-16W4/0RBY 02 HZ EDWAND 8-25-61-16IssuedPUMP2069.0 m
00/08-25-061-16W4/2RBY HZ EDWAND 8-25-61-16AmendedPUMP2168.0 m
02/04-21-056-03W4/8RBY 02 HZ LIND 4-21-56-3IssuedPUMP2178.0 m
00/13-26-061-16W4/0RBY HZ EDWAND 13-26-61-16AmendedFLOW2289.0 m
00/09-16-056-03W4/7RBY HZ LIND 9-16-56-3IssuedPUMP2206.0 m
00/09-25-061-16W4/0RBY HZ EDWAND 9-25-61-16AmendedPUMP2306.0 m
03/02-22-056-03W4/5RBY 03 HZ LIND 2-22-56-3IssuedPUMP2394.0 m
00/12-26-061-16W4/0RBY HZ EDWAND 12-26-61-16AmendedPUMP2102.0 m
00/04-02-064-18W4/9RBY HZ FIGURE 4-2-64-18IssuedPUMP2189.0 m
00/09-23-056-03W4/0RBY HZ LIND 9-23-56-3AmendedPUMP1759.0 m
00/08-26-064-18W4/0RBY HZ FIGURE 8-26-64-18IssuedFLOW2086.0 m
03/11-23-056-03W4/0RBY 03 HZ LIND 11-23-56-3AmendedPUMP706.0 m
03/12-18-056-02W4/7RBY 03 HZ LIND 12-18-56-2AmendedPUMP2653.0 m
00/01-01-064-18W4/0RBY HZ FIGURE 1-1-64-18IssuedPUMP2298.0 m
00/13-35-063-18W4/8RBY HZ FIGURE 13-35-63-18IssuedFLOW2134.0 m
02/13-24-056-03W4/0RBY 02 HZ LIND 13-24-56-3AmendedPUMP2805.0 m
02/12-35-063-18W4/0RBY 02 HZ FIGURE 12-35-63-18Issued2062.0 m
04/12-18-056-02W4/3RBY 04 HZ LIND 12-18-56-2IssuedPUMP2725.0 m
00/12-35-063-18W4/5RBY HZ FIGURE 12-35-63-18IssuedPUMP2195.0 m
03/11-24-056-03W4/2RBY 03 HZ LIND 11-24-56-3IssuedPUMP2008.0 m
00/16-36-063-18W4/8RBY HZ FIGURE 16-36-63-18IssuedPUMP2178.0 m
03/11-18-056-02W4/0RBY 03 HZ LIND 11-18-56-2AmendedPUMP2418.0 m
00/05-35-063-18W4/8RBY HZ FIGURE 5-35-63-18IssuedFLOW2284.0 m
03/09-18-056-02W4/0RBY 03 HZ LIND 9-18-56-2AmendedPUMP2651.0 m
00/09-36-063-18W4/7RBY HZ FIGURE 9-36-63-18IssuedFLOW2232.0 m
00/13-24-056-03W4/0RBY HZ LIND 13-24-56-3IssuedPUMP2752.0 m
00/06-30-056-02W4/0RBY HZ LIND 6-30-56-2AmendedPUMP2058.0 m
00/08-36-063-18W4/8RBY HZ FIGURE 8-36-63-18IssuedPUMP2433.0 m
03/13-24-056-03W4/7RBY 03 HZ LIND 13-24-56-3AmendedPUMP2305.0 m
02/12-24-056-03W4/0RBY 02 HZ LIND 12-24-56-3IssuedPUMP2285.0 m
03/09-18-056-03W4/9RBY HZ LIND 9-18-56-3IssuedPUMP2176.0 m
03/02-26-063-18W4/0RBY 03 HZ FIGURE 2-26-63-18IssuedFLOW3164.0 m
00/14-33-061-17W4/2RBY HZ FIGURE 14-33-61-17IssuedPUMP3140.0 m
00/01-12-057-04W4/0RBY HZ LIND 1-12-57-4AmendedPUMP2329.0 m
02/01-12-057-04W4/0RBY 02 HZ LIND 1-12-57-4AmendedPUMP2200.0 m
02/04-32-060-17W4/0RBY 02 HZ EDWAND 4-32-60-17AmendedPUMP2332.0 m
03/08-12-057-04W4/3RBY 03 HZ LIND 8-12-57-4IssuedPUMP2160.0 m
00/01-14-062-18W4/0RBY HZ LUCKY 1-14-62-18IssuedFLOW2860.0 m
04/09-12-057-04W4/0RBY 04 HZ LIND 9-12-57-4IssuedPUMP2082.0 m
00/10-20-063-17W4/3RBY HZ FIGURE 10-20-63-17IssuedPUMP2503.0 m
03/16-12-057-04W4/3RBY 03 HZ LIND 16-12-57-4IssuedPUMP2508.0 m
00/15-20-063-17W4/7RBY HZ FIGURE 15-20-63-17IssuedPUMP2456.0 m
02/07-14-057-04W4/5RBY 02 HZ LIND 7-14-57-4AmendedPUMP2097.0 m
00/06-14-057-04W4/2RBY HZ LIND 6-14-57-4AmendedPUMP2176.0 m
02/01-31-063-17W4/0RBY HZ FIGURE 1-31-63-17IssuedPUMP3069.0 m
00/09-32-056-03W4/0RBY HZ LIND 9-32-56-3AmendedPUMP2766.0 m
00/02-31-063-17W4/0RBY HZ FIGURE 2-31-63-17IssuedPUMP2731.0 m
02/16-32-056-03W4/0RBY HZ LIND 16-32-56-3AmendedPUMP2684.0 m
00/15-30-063-17W4/6RBY HZ FIGURE 15-30-63-17AmendedPUMP2670.0 m
00/16-32-056-03W4/2RBY HZ LIND 16-32-56-3AmendedPUMP2679.0 m
04/04-12-075-26W4/0RBY 04 HZ MARTENH 4-12-75-26Issued3005.0 m
00/14-30-063-17W4/6RBY HZ FIGURE 14-30-63-17AmendedPUMP2643.0 m
05/12-05-057-03W4/2RBY 05 HZ LIND 12-5-57-3AmendedPUMP2881.0 m
02/04-19-063-14W4/0RBY 02 HZ CRAIGND 4-19-63-14IssuedPUMP775.0 m
05/04-05-057-03W4/0RBY 05 HZ LIND 4-5-57-3AmendedPUMP2585.0 m
00/09-04-061-17W4/6RBY HZ EDWAND 9-4-61-17AmendedPUMP2371.0 m
05/05-05-057-03W4/2RBY 05 HZ LIND 5-5-57-3AmendedPUMP2673.0 m
02/07-32-056-02W4/9RBY 02 HZ LIND 7-32-56-2AmendedPUMP2495.0 m
00/10-26-062-19W4/5RBY HZ FIGURE 10-26-62-19AmendedPUMP2894.0 m
00/07-08-061-17W4/0RBY HZ EDWAND 7-8-61-17IssuedPUMP2337.0 m
00/01-19-056-02W4/2RBY HZ LIND 1-19-56-2AmendedPUMP2369.0 m
00/02-26-062-19W4/2RBY HZ FIGURE 2-26-62-19AmendedPUMP2645.0 m
02/06-08-061-17W4/0RBY 02 HZ EDWAND 6-8-61-17IssuedPUMP2262.0 m
02/14-17-056-02W4/0RBY 02 MHZ LIND 14-17-56-2AmendedFLOW2268.0 m
00/05-10-063-17W4/2RBY HZ FIGURE 5-10-63-17IssuedPUMP2674.0 m
00/07-26-062-19W4/0RBY HZ FIGURE 7-26-62-19IssuedPUMP2692.0 m
00/14-17-056-02W4/3RBY MHZ LIND 14-17-56-2AmendedFLOW2271.0 m
02/11-20-072-17W4/0RBY 02 HZ CALL LK 11-20-72-17AmendedPUMP2280.0 m
00/03-19-062-18W4/2RBY HZ FIGURE 3-19-62-18IssuedFLOW2718.0 m
00/13-17-056-02W4/0RBY MHZ LIND 13-17-56-2IssuedPUMP2573.0 m
00/16-25-061-16W4/2RBY HZ EDWAND 16-25-61-16AmendedPUMP2289.0 m
00/05-32-056-02W4/2BUFMEC HZ 1B5 LIND 5-32-56-2AmendedPUMP2545.0 m
00/05-26-061-16W4/0RBY HZ EDWAND 5-26-61-16IssuedPUMP2102.0 m
00/04-19-062-18W4/2RBY HZ FIGURE 4-19-62-18AmendedPUMP2530.0 m
00/03-20-056-02W4/5BUFMEC MHZ 3-29 LIND 3-20-56-2IssuedSUSP2114.0 m
00/08-17-062-16W4/0RBY HZ EDWAND 8-17-62-16IssuedPUMP2475.0 m
02/04-20-056-02W4/3BUFMEC 102 MHZ 3-29 LIND 4-20-56-2IssuedPUMP2068.0 m
02/08-23-062-19W4/0RBY 02 HZ FIGURE 8-23-62-19AmendedPUMP2958.0 m
02/13-29-062-16W4/4RBY 02 HZ EDWAND 13-29-62-16IssuedPUMP2183.0 m
00/04-20-056-02W4/0BUFMEC MHZ 3-29 LIND 4-20-56-2IssuedPUMP2221.0 m
00/08-23-062-19W4/2RBY HZ FIGURE 8-23-62-19AmendedPUMP2701.0 m
03/16-14-063-18W4/0RBY 03 HZ FIGURE 16-14-63-18AmendedPUMP2452.0 m
04/10-32-056-03W4/7BUFMEC 104 MHZ 7-31 LIND 10-32-56-3IssuedPUMP2222.0 m
02/16-14-063-18W4/2RBY 02 HZ FIGURE 16-14-63-18AmendedFLOW2643.0 m
00/06-20-062-18W4/3RBY HZ FIGURE 6-20-62-18IssuedPUMP2232.0 m
00/14-16-063-18W4/0RBY HZ FIGURE 14-16-63-18AmendedPUMP2223.0 m
00/07-32-056-03W4/0BUFMEC MHZ 7-31 LIND 7-32-56-3IssuedPUMP2155.0 m
02/07-32-056-03W4/3BUFMEC 102 MHZ 7-31 LIND 7-32-56-3IssuedPUMP2167.0 m
00/09-23-062-19W4/0RBY HZ FIGURE 9-23-62-19AmendedPUMP2809.0 m
00/14-28-063-18W4/2RBY HZ FIGURE 14-28-63-18AmendedPUMP2303.0 m
00/04-14-057-04W4/0BUFMEC MHZ 8-11 LIND 4-14-57-4IssuedPUMP1843.0 m
00/11-20-062-18W4/2RBY HZ FIGURE 11-20-62-18IssuedPUMP2388.0 m
00/06-09-062-16W4/0RBY HZ EDWAND 6-9-62-16IssuedPUMP2769.0 m
00/16-10-057-04W4/0BUFMEC MHZ 8-11 LIND 16-10-57-4IssuedPUMP1851.0 m
00/09-32-063-17W4/0RBY HZ FIGURE 9-32-63-17AmendedPUMP2064.0 m
00/09-10-057-04W4/0BUFMEC MHZ 8-11 LIND 9-10-57-4IssuedPUMP2087.0 m
00/16-32-063-17W4/0RBY HZ FIGURE 16-32-63-17IssuedPUMP2182.0 m
04/04-17-056-03W4/0BUFMEC 104 MHZ 16-8 LIND 4-17-56-3IssuedPUMP1487.0 m
00/08-10-057-04W4/0BUFMEC MHZ 8-11 LIND 8-10-57-4IssuedPUMP1969.0 m

Showing first 100 wells.

Search all wells for this operator

View the complete well inventory for operator A8N90.

Data sourced from AER ST37 public well records.

Engineering Assistant